ABOUT PROJECT

When this 1989 home was built, the hall bath was separated between the tub/ vanity area and toilet/vanity area. This division made the room seem smaller and didn’t allow for the function or storage the current family now needs. They requested the space be opened and updated.
Here is what we changed:
— removed pocket door & wall between toilet & tub area
— replaced tub & faucet with new single temperature safe handle
— installed new gray cabinetry with lots of storage drawers
— installed ceramic tile flooring in fun herringbone pattern
The new bathroom feels larger and brighter with the new layout!
Colorful accessories add to make this a fun room to get ready for school!

ACCREDITATIONS